APPLICATION / Renewable
Wind Farms
Wind turbine nacelle and collector substation transformers.
PROJECT CONTEXT
Translate the application into a verified scope.
Application requirements are reviewed with the project team before the transformer configuration and documentation package are confirmed.
Final transformer ratings, applicable standards and documentation are confirmed after project qualification.